SATECO, la liberté d’imaginer
LES PROJETS LES PLUS COMPLEXES !
In Sateco Company, we are free
to imagine the most detailed projects!
WATER TANKS & MALL
(UNITED ARAB EMIRATES)

Sateco participated altogether with SIX CONSTRUCT (BESIX Group) to those 2 projects.

WATER TANKS construction in DUBAÏ, Sateco TP Shutter
Easy mounting and assembling in great height (all safety and stability accessories integrated)

- Easy set up (possibility to lift a wall up to 20 m long in one operation)
- sealing

TP Shutter
In Sateco Company, we are free
to imagine the most detailed projects!
TGV Railways TOURS-BORDEAUX
(FRANCE)

SATECO met the specifications of the TGV Railways worksite (VINCI Group) with a global approach. The TPC shutter, specially adapted to concrete pouring of bridges columns in great height, was optimized by our Design Office to fit the special requests of this worksite and to pour in one operation the column and its header.

TPC shutter
In Sateco Company, we are free
to imagine the most detailed projects!
Poya Bridge
(Art Works – Switzerland)

After a design competition, this art work was achieved in a contemporary architecture and thought in the great tradition of suspended bridges of Fribourg city.

In order to meet the specifications as well as the high and special demands from our society, SATECO managed to match its equipment strengths to the quality of its Design Office and adapted its standard products (mixed TPC shutters + P3D platforms) to achieve a unique construction.

P3D platform
In Sateco Company, we are free
to imagine the most detailed projects!
WATER TANKS & MALL
(UNITED ARAB EMIRATES)

Sateco participated altogether with SIX CONSTRUCT (BESIX Group) to those 2 projects

Construction of a Mall in Abu Dhabi, with SATECO Precast beams
Sateco supplied the worksite with 32 columns, 9m high, designed for the incorporation of concrete precast beams on the top.
Concrete pouring time optimized (900 columns achieved in 6 months instead of 9)
Formworking tool in half shell without tie rods passing through.

SATECO, a reliable partner for your construction projects

STUDY, DESIGN, IMPLEMENTATION
from your concrete layouts

Full range of formworks

Any shapes on demand

Full range of formworks

Full range of safety products

For worksites

Full range of safety products

Slab formworks

Take Off Prop Innovation

Slab formworks

Training

on site

FORMWORKS PRODUCTS

TPC Panel

TPC Panel

A tool ready for use !

Easy use :
Panel delivered with its  safety, access and assembling accessories  (integrated and unlosable) = -20% of assembling parts compared to the standard shutters on the market.

Ensured Productivity :
Unlimited concrete speed up to 7.60 m high (maximum deflection 2.5mm) = -40% of tierods to position on the wall compared to the standard shutters on the market.

To know more
 
SC9015/SC1015 Shutters

SC9015/SC1015 Shutters

For a perfect concrete finish !

Strength tested—ready for use
Concrete pressure : 15 tonnes / sqm
Panel delivered ready for use with safety and stability accessories
Steel formworking face
Setting time : 1’30’’/sqm
Unlimited concrete speed up to 8.90m high

To know more
 
One face formworking tools

One face formworking tools

Tailored solutions adapted to your worksites issues

From SATECO standard formworking solutions, we can study on your request with your concrete designs, a special formworking tool that fits the needs of your worksite.

To know more
 
CTR 4010 Shutters

CTR 4010 Shutters

All shapes on request !

Concrete pressure : 10 tonnes / sqm

Panel with sheet formworking face for curved wall (mini. Radius : 3.00 m) Automatic adjustment of the radius with the CC adjustment kit (height 5.00m)

Safety and stability accessories integrated in the panel

To know more
 
P3D

SAFETY PRODUCTS

A full range for safety on the worksites

- P3D and PTE: corbelling working platform,
- PCE: podium to optimize safety in staircase wells
- PCA: podium to optimize safety in lift shafts
- REMAT/SMAT: platform to store tools.

To know more
 
« Take Off » Prop

« Take Off » Prop for slab formwork

« Take Off » is a prop to set up slab formworks, Maximum static load 3 000Kg/prop and maximum lifting load 500Kg.
The shuttering setting height is possible at 1.10m, Setting the slab to be cast is done in one operation withthe remote control.

To know more
 
For 60
Years
220
Workers
60
Patents
since 2009
40%
of the French Market
21000
SQM PRODUCTION WORKSHOP
10000
tons of
Steal/year